2006 Piston Cores. Pre-engineering in Indonesia

Carma carried out a geotechnical survey in 2006 in Makassar Strait (Indonesia), for a study concentrated on laying pipeline.

The Active Piston Corer CP-20 was the key instrument of the survey: going across deep layers achieved the goal requested by the client.

Car.ma provided the know-how and the technical advice for IDMC Impresub S.r.l. Company during the job performed for the client Chevron-Unocal.

 

Downloads:

Between 25th March and 14th April 2006 Carma has performed a geotechnical survey on board O/V TOISA MARINER in Makassar Strait, Indonesia.

pdfCase Histories Carma Piston Corer ENG.pdf992.59 KB

 

Copyright by Carmacoring 2012-17. All rights reserved. P.I. 02736361201

Log in to your account or

Questo sito web utilizza i cookie per essere sicuri di offrirvi la migliore esperienza di navigazione possibile. Chiudendo questo banner, scorrendo questa pagina, cliccando su un link o proseguendo la navigazione in altra maniera, acconsenti all’uso dei cookie. Tutti i dettagli relativi l'utilizzo dei cookie sono consultabili al seguente link Privacy Policy.

Accetto cookie

EU Cookie Directive Plugin Information