Carma carried out a geotechnical survey in 2006 in Makassar Strait (Indonesia), for a study concentrated on laying pipeline.
The Active Piston Corer CP-20 was the key instrument of the survey: going across deep layers achieved the goal requested by the client.
Car.ma provided the know-how and the technical advice for IDMC Impresub S.r.l. Company during the job performed for the client Chevron-Unocal.
Download file
Case Histories Carma Piston Corer.pdf (italian version)
Between 25th March and 14th April 2006 Carma has performed a geotechnical survey on board O/V TOISA MARINER in Makassar Strait, Indonesia.
Case Histories Carma Piston Corer ENG.pdf (english version)
Related Posts
2014 Piston core. Floating Wind Farm in the Gulf of Lion.
Piston core drilling in the Gulf of Lion for a pre-engineering survey of a floating Wind Farm,…
2013 Piston Cores. Neptun Block Project in Black Sea
Piston Cores for Neptun Block Project in Black Sea, carried out for D’Appolonia SpA…
2013 Piston Cores. Environ Srl (Client Syndial SpA – ENI Group)
Piston Cores in an Italian Lake, carried out for Environ Srl (Client Syndial SpA – ENI Group). For…