Piston Cores in Egypt for a pre-engineering survey, carried out for D’Appolonia SpA (Sub-Contractor Fugro, Contractor Technip, Client Burullus). Has been performed 15 metres cores and obtained recovery between 85 and 90%, achieving a maximum sample length of 13.28 metres!
Related Posts
2014 Piston core. Floating Wind Farm in the Gulf of Lion.
Piston core drilling in the Gulf of Lion for a pre-engineering survey of a floating Wind Farm,…
2013 Piston Cores. Neptun Block Project in Black Sea
Piston Cores for Neptun Block Project in Black Sea, carried out for D’Appolonia SpA…
2013 Piston Cores. Environ Srl (Client Syndial SpA – ENI Group)
Piston Cores in an Italian Lake, carried out for Environ Srl (Client Syndial SpA – ENI Group). For…