Case histories

Carmacoring S.r.l. carried out different project in recent years in Italy and abroad, for geotechnical purposes, environmental scope and scientific research.

Previously the Marine Geology Institute of CNR in Bologna had performed numerous surveys in the Mediterranean Sea, Red Sea, the Atlantic Ocean and the Ross Sea for PNRA (National Research Project in Antarctica-ENEA), making use of different sampling instruments designed by Angelo Magagnoli and now commercialized by Carmacoring S.r.l.

Case histories

  • 1
  • 2
Prev Next

2013 Piston Cores. Neptun Block Project …

Piston Cores for Neptun Block Project in Black Sea, carried out for D'Appolonia SpA (Contractor Fugro Alluvial, Client EXXON). Were executed 14 Piston Cores 15m long between 356 and 1090...

2013 Piston Cores. Environ Srl (Client S…

Piston Cores in an Italian Lake, carried out for Environ Srl (Client Syndial SpA – ENI Group). For the first time were performed 6 Piston Cores in a lake up...

2012 Piston Cores. C.N.R. Adriatic Sea

Piston Cores in Adriatic Sea, carried out for ISMAR Bologna-CNR. Has been done 9 Piston Cores of 15 meters. 4 of these has been performed using the Angel Descent. For...

2011 Piston Cores. IGI Italy-Greece

Piston Cores for IGI Poseidon Project, carried out for D'Appolonia SpA (Contractor Fugro, Client Edison). Has been executed 23 Piston Cores between 65 and 1350 meters water depth. The setup...

2011 Piston Cores. Italian Harbour

Piston Cores for the engineering of an harbor design, carried out for Fincosit SpA. Has been requested to sample in 5-7 metres of water with a corer 8 metres long....

2010 Piston Cores. Pre-engineering in Eg…

Piston Cores in Egypt for a pre-engineering survey, carried out for D'Appolonia SpA (Sub-Contractor Fugro, Contractor Technip, Client Burullus). Has been performed 15 metres cores and obtained recovery between 85...

2009 Cores with Carma® Corer SW-104. Ita…

Cores with CARMA® Corer SW-104 in Italian lakes, carried out for Environ Srl (Client Syndial SpA). Has been executed more than 100 cores with the scope of achieve undisturbed samples....

2008 Piston Cores. C.N.R. Adriatic Sea

Piston Cores in Adriatic Sea, carried out for ISMAR Bologna-CNR. Has been done 18 Piston Cores of a variable length of 5-10-15 and 20 metres! For this project has been...

Oceanographic Survey for scientific rese…

I.G.M. of CNR in Bologna, for institutional research, had performed numerous surveys in the Mediterranean Sea, Red Sea, the Atlantic Ocean and the Ross Sea for PNRA (National Research Project...

2006 Piston Cores. Pre-engineering in In…

Carma carried out a geotechnical survey in 2006 in Makassar Strait (Indonesia), for a study concentrated on laying pipeline. The Active Piston Corer CP-20 was the key instrument of the survey:...

Copyright by Carmacoring 2012-18. All rights reserved. P.I. 02736361201

Log in to your account or