2010 Piston Cores. Pre-engineering in Egypt

Piston Cores in Egypt for a pre-engineering survey, carried out for D'Appolonia SpA (Sub-Contractor Fugro, Contractor Technip, Client Burullus). Has been performed 15 metres cores and obtained recovery between 85 and 90%, achieving a maximum sample length of 13.28 metres!

Copyright by Carmacoring 2012-18. All rights reserved. P.I. 02736361201

Log in to your account or