6.jpg

2013 Piston Cores. Environ Srl (Client Syndial SpA – ENI Group)

Piston Cores in an Italian Lake, carried out for Environ Srl (Client Syndial SpA – ENI Group). For the first time were performed 6 Piston Cores in a lake up to 10 meters in length, with the aim of obtaining undisturbed samples, near the mouth of a river.

To achieve this goal we used the new coring method: Angel Descent. The results have been excellent, recovering up to 8 meters of sample, with a recovery ratio of 100%! In addition, for this project, Carmacoring has planned the necessary equipment on board of a pontoon.

pdfSummary_Piston_Cores_Italian_Lake_2013.pdf22.27 KB

Copyright by Carmacoring 2012-18. All rights reserved. P.I. 02736361201

Log in to your account or