#Solutions
Jumbo VibroCorer
After the samples obtained with our other Corers on fine sediment, we now also reach coarser sediments with the Jumbo VibroCorer.
This 8.2 tons instrument with a 6 meter tube for depths up to 250 meters.
#Solutions
Angel Descent
The need for accurate and undisturbed core samples has led to the development of this new coring method with controlled penetration speed, in order to obtain sediment samples with more accurate outcomes.
#products
Carma® Piston Corer
A newly-designed Carma® Piston Corer has been conceived to retrieve cores of large diameter up to 30 m long.
#products
Carma® Gravity Corer SW-104
SW-104 is a light corer, 100 Kg maximum, designed with the purpose of recovering cores of clay and bottom water sample. It is ideally suited to marine and lacustrine environments to studies of pollution.
#products
Carma® Handling system (LARS)
In recent months Carmacoring has created a new controlled handling system, fast and safe for long corers of up to 30 meters.
#products
Gravity Corer
This is an instrument of great strength and easy to use, suitable for coring a seafloor characterised by sediment with different lithological compositions, even compact or soft cemented.
#products
Light Box Corer
This is an instrument intended for the recovery of superficial samples of the seabed which are then held in a metal box. The sample collected is characterized by a low rate of disturbance to the sedimentary structure and includes the bottom water sample.
#products
Grabs
The must common grab is the Van Veen, consisting of two contrasting valves, centrally hinged and that lean on the seafloor in an open position. Another kind of grab is the Shipek model, which collects the sample in a semicylindric box, kept open until impact with the seabed.
#products
Cylindrical Dredge
This instrument has been utilised since the seventies to tear up and collect rock samples, concretion and calcrete from slope outcroppings.
CASE HISTORY
Company profile
Carmacoring S.r.l. combines seabed survey experience with respect for the environment and work site safety, offering its clients a complete package and total reliability.
Contacts
Case History
2023 Piston cores in the Gulf of Lion
Piston cores in the Gulf of Lion for a pre-engineering survey of a floating Wind Farm, performed for TecnoAmbiente. Piston cores was performed with recovery rates up to 91% using Angel Descent…
2014 Piston core. Floating Wind Farm in the Gulf of Lion.
Piston core drilling in the Gulf of Lion for a pre-engineering survey of a floating Wind Farm, performed for Igeotest (Client: EDF). Piston core drilling was performed with recovery rates up to 98%.……
2013 Piston Cores. Neptun Block Project in Black Sea
Piston Cores for Neptun Block Project in Black Sea, carried out for D’Appolonia SpA (Contractor Fugro Alluvial, Client EXXON). Were executed 14 Piston Cores 15m long between 356 and 1090 meters…
2013 Piston Cores. Environ Srl (Client Syndial SpA – ENI Group)
Piston Cores in an Italian Lake, carried out for Environ Srl (Client Syndial SpA – ENI Group). For the first time were performed 6 Piston Cores in a lake up to 10 meters in length, with the aim of…
2012 Piston Cores. C.N.R. Adriatic Sea
Piston Cores in Adriatic Sea, carried out for ISMAR Bologna-CNR. Has been done 9 Piston Cores of 15 meters. 4 of these has been performed using the Angel Descent. For the first time, and with great…
2011 Piston Cores.
IGI Italy-Greece
Piston Cores for IGI Poseidon Project, carried out for D’Appolonia SpA (Contractor Fugro, Client Edison). Has been executed 23 Piston Cores between 65 and 1350 meters water depth. The setup of…
2011 Piston Cores. Italian Harbour
Piston Cores for the engineering of an harbor design, carried out for Fincosit SpA. Has been requested to sample in 5-7 metres of water with a corer 8 metres long. To achieve this request has been…
2010 Piston Cores. Pre-engineering in Egypt
Piston Cores in Egypt for a pre-engineering survey, carried out for D’Appolonia SpA (Sub-Contractor Fugro, Contractor Technip, Client Burullus). Has been performed 15 metres cores and obtained…
2009 Cores with Carma® Corer SW-104. Italian Lakes
Cores with CARMA® Corer SW-104 in Italian lakes, carried out for Environ Srl (Client Syndial SpA). Has been executed more than 100 cores with the scope of achieve undisturbed samples. The criticality…