2010 Piston Cores. Pre-engineering in Egypt

Piston Cores in Egypt for a pre-engineering survey, carried out for D'Appolonia SpA (Sub-Contractor Fugro, Contractor Technip, Client Burullus). Has been performed 15 metres cores and obtained recovery between 85 and 90%, achieving a maximum sample length of 13.28 metres!

These tools are used in...

2009 Cores with Carma® Corer SW-104. Italian Lakes

Cores with CARMA® Corer SW-104 in Italia...

space
  • HeadHead
  • LinerLiner
  • NoseNose
  • SW-104 Side viewSW-104 Side view
  • SW-104 frontal viewSW-104 frontal view
  • Sample from SW-104-3Sample from SW-104-3
  • Sample from SW-104-4Sample from SW-104-4
  • Sample from SW-104Sample from SW-104
  • Sample from SW-104_2Sample from SW-104_2
  • TopTop

Copyright by Carmacoring 2012-19. All rights reserved. P.I. 02736361201

Log in to your account or