2011 Piston Cores. Italian Harbour

Piston Cores for the engineering of an harbor design, carried out for Fincosit SpA. Has been requested to sample in 5-7 metres of water with a corer 8 metres long. To achieve this request has been devise a new coring methodology: Angel Descent (See the movie).

These tools are used in...

Prev Next

2013 Piston Cores. Neptun Block Project in Black Sea

Piston Cores for Neptun Block Project in...

2011 Piston Cores. IGI Italy-Greece

Piston Cores for IGI Poseidon Project, c...

2011 Piston Cores. Italian Harbour

Piston Cores for the engineering of an h...

2010 Piston Cores. Pre-engineering in Egypt

Piston Cores in Egypt for a pre-engineer...

2008 Piston Cores. C.N.R. Adriatic Sea

Piston Cores in Adriatic Sea, carried ou...

2006 Piston Cores. Pre-engineering in Indonesia

Carma carried out a geotechnical survey ...

space
  • AccelerationAcceleration
  • Active pistonActive piston
  • Carma® Piston CorerCarma® Piston Corer
  • Dynamometric graph exampleDynamometric graph example
  • Piston Corer with Accelerometer-2Piston Corer with Accelerometer-2
  • Piston Corer with AccelerometerPiston Corer with Accelerometer
  • The new handling systemThe new handling system
  • piston_corer-1piston_corer-1
  • piston_corer-2piston_corer-2
  • piston_corer-3piston_corer-3
  • piston_corer-4piston_corer-4
  • piston_corer-5piston_corer-5
  • piston_corer-6piston_corer-6

Copyright by Carmacoring 2012-18. All rights reserved. P.I. 02736361201

Log in to your account or